Employee Login Plan Room

Full Service Commercial Concrete Subcontractor

Thunderbird High School Phase 2

This project consisted of the demolition of four existing buildings and the construction of two new buildings. The new buildings included a 65,000 sf 2-story Classroom building H and a 16,900 sf single story Administration Building A.

Hardrock's scope of work included continuous and spread footings, elevator pit, interior slab on grade over ABC, vapor barrier, stair pan fill, concrete over metal deck, reinforcing, concrete tilt panels, sidewalks, curb and gutter, fire lane, splash pads, and equipment pads.

View more Educational projects or View all projects
Send bid invitations to: bidinvites@hrconcrete.com
Phoenix Map
4839 W. Brill St.
Phoenix, AZ 85043
(t) 602.233.3334 • (f) 602.233.2777
Tucson Map
6360 S. Del Moral Blvd.
Tucson, AZ 85706
(t) 520.807.6265 • (f) 520.807.6271
Albuquerque Map
One Sun Plaza
100 Sun Avenue N.E. Suite 607
Albuquerque, NM 87109
(t) 505.288.1979
TOLL FREE 800.788.5278
Connect with us!

Arizona • License ROC #096338 L-9 | California • License #925931 C-8

New Mexico • License #362105 GS-04 | Texas • Contractor license not required

Avenue 25 - Phoenix Web & Graphic Design Studio