Employee Login Plan Room

Full Service Commercial Concrete Subcontractor

Greenway High School Phase 4

This project consisted of the demolition of three existing buildings and the construction of two new buildings. The new buildings included a 23,240 sf 2-story Classroom Building A and a 17,450 sf single story Administration Office Building I.

Hardrock's scope of work included continuous and spread footings, interior slab on grade, vapor barrier, slab on metal deck, stair pan fill, liquid membrane curing compound, concrete tilt panels, curb and gutter, and reinforcing.

View more Educational projects or View all projects
Send bid invitations to: bidinvites@hrconcrete.com
Phoenix Map
4839 W. Brill St.
Phoenix, AZ 85043
(t) 602.233.3334 • (f) 602.233.2777
Tucson Map
6360 S. Del Moral Blvd.
Tucson, AZ 85706
(t) 520.807.6265 • (f) 520.807.6271
Albuquerque Map
One Sun Plaza
100 Sun Avenue N.E. Suite 607
Albuquerque, NM 87109
(t) 505.288.1979
TOLL FREE 800.788.5278
Connect with us!

Arizona • License ROC #096338 L-9 | California • License #925931 C-8

New Mexico • License #362105 GS-04 | Texas • Contractor license not required

Avenue 25 - Phoenix Web & Graphic Design Studio