Portfolio
-
USAA Phoenix Norterra
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 USAA.jpgLocation: Phoenix, AZ \ G.C.: Holder Construction \ Date Completed: 2006 \ Cubic Yards Poured: 2,028 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
USAA Phoenix Norterra
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 USAA.jpgLocation: Phoenix, AZ \ G.C.: Holder Construction \ Date Completed: 2006 \ Cubic Yards Poured: 2,028 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
USAA Phoenix Norterra
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 USAA.jpgLocation: Phoenix, AZ \ G.C.: Holder Construction \ Date Completed: 2006 \ Cubic Yards Poured: 2,028 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
USAA Phoenix Norterra
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 USAA.jpgLocation: Phoenix, AZ \ G.C.: Holder Construction \ Date Completed: 2006 \ Cubic Yards Poured: 2,028 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
2nd Street Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 2nd.jpgLocation: Scottsdale, AZ \ G.C.: Smith Woods Contracting \ Date Completed: 2006 \ Cubic Yards Poured: 3,675 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
2nd Street Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 2nd.jpgLocation: Scottsdale, AZ \ G.C.: Smith Woods Contracting \ Date Completed: 2006 \ Cubic Yards Poured: 3,675 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
2nd Street Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 2nd.jpgLocation: Scottsdale, AZ \ G.C.: Smith Woods Contracting \ Date Completed: 2006 \ Cubic Yards Poured: 3,675 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
2nd Street Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 2nd.jpgLocation: Scottsdale, AZ \ G.C.: Smith Woods Contracting \ Date Completed: 2006 \ Cubic Yards Poured: 3,675 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
2nd Street Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 2nd.jpgLocation: Scottsdale, AZ \ G.C.: Smith Woods Contracting \ Date Completed: 2006 \ Cubic Yards Poured: 3,675 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
2nd Street Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 2nd.jpgLocation: Scottsdale, AZ \ G.C.: Smith Woods Contracting \ Date Completed: 2006 \ Cubic Yards Poured: 3,675 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
2nd Street Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 2nd.jpgLocation: Scottsdale, AZ \ G.C.: Smith Woods Contracting \ Date Completed: 2006 \ Cubic Yards Poured: 3,675 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
2nd Street Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 2nd.jpgLocation: Scottsdale, AZ \ G.C.: Smith Woods Contracting \ Date Completed: 2006 \ Cubic Yards Poured: 3,675 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
5th Avenue Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 5th.jpgLocation: Scottsdale, AZ \ G.C.: Smith Woods Contracting \ Date Completed: 2006 \ Cubic Yards Poured: 3,116 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
5th Avenue Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 5th.jpgLocation: Scottsdale, AZ \ G.C.: Smith Woods Contracting \ Date Completed: 2006 \ Cubic Yards Poured: 3,116 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
5th Avenue Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 5th.jpgLocation: Scottsdale, AZ \ G.C.: Smith Woods Contracting \ Date Completed: 2006 \ Cubic Yards Poured: 3,116 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
5th Avenue Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 5th.jpgLocation: Scottsdale, AZ \ G.C.: Smith Woods Contracting \ Date Completed: 2006 \ Cubic Yards Poured: 3,116 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Mayo Clinic HBSC
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Mayo.jpgLocation: Scottsdale, AZ \ G.C.: McGough Construction \ Date Completed: 2006 \ Cubic Yards Poured: 8,460 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Mayo Clinic HBSC
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Mayo.jpgLocation: Scottsdale, AZ \ G.C.: McGough Construction \ Date Completed: 2006 \ Cubic Yards Poured: 8,460 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Mayo Clinic HBSC
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Mayo.jpgLocation: Scottsdale, AZ \ G.C.: McGough Construction \ Date Completed: 2006 \ Cubic Yards Poured: 8,460 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Mayo Clinic HBSC
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Mayo.jpgLocation: Scottsdale, AZ \ G.C.: McGough Construction \ Date Completed: 2006 \ Cubic Yards Poured: 8,460 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Mayo Clinic HBSC
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 mayo.jpgLocation: Scottsdale, AZ \ G.C.: McGough Construction \ Date Completed: 2006 \ Cubic Yards Poured: 8,460 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Mayo Clinic HBSC
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 Mayo.jpgLocation: Scottsdale, AZ \ G.C.: McGough Construction \ Date Completed: 2006 \ Cubic Yards Poured: 8,460 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Mayo Clinic HBSC
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 Mayo.jpgLocation: Scottsdale, AZ \ G.C.: McGough Construction \ Date Completed: 2006 \ Cubic Yards Poured: 8,460 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Mayo Clinic HBSC
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 Mayo.jpgLocation: Scottsdale, AZ \ G.C.: McGough Construction \ Date Completed: 2006 \ Cubic Yards Poured: 8,460 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Mayo Clinic HBSC
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/10 Mayo.jpgLocation: Scottsdale, AZ \ G.C.: McGough Construction \ Date Completed: 2006 \ Cubic Yards Poured: 8,460 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Mayo Clinic HBSC
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/9 Mayo.jpgLocation: Scottsdale, AZ \ G.C.: McGough Construction \ Date Completed: 2006 \ Cubic Yards Poured: 8,460 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Mayo Clinic HBSC
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/11 Mayo.jpgLocation: Scottsdale, AZ \ G.C.: McGough Construction \ Date Completed: 2006 \ Cubic Yards Poured: 8,460 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Perimeter Parkview Corporate Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Perimeter.jpgLocation: Scottsdale, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 6,135 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Perimeter Parkview Corporate Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Perimeter.jpgLocation: Scottsdale, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 6,135 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
McDowell Mountain Ranch Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 MMR.jpgLocation: Scottsdale, AZ \ G.C.: Rytan Construction \ Date Completed: 2007 \ Cubic Yards Poured: 3,196 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
McDowell Mountain Ranch Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 MMR.jpgLocation: Scottsdale, AZ \ G.C.: Rytan Construction \ Date Completed: 2007 \ Cubic Yards Poured: 3,196 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
McDowell Mountain Ranch Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 MMR.jpgLocation: Scottsdale, AZ \ G.C.: Rytan Construction \ Date Completed: 2007 \ Cubic Yards Poured: 3,196 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
McDowell Mountain Ranch Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 MMR.jpgLocation: Scottsdale, AZ \ G.C.: Rytan Construction \ Date Completed: 2007 \ Cubic Yards Poured: 3,196 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
McDowell Mountain Ranch Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 MMR.jpgLocation: Scottsdale, AZ \ G.C.: Rytan Construction \ Date Completed: 2007 \ Cubic Yards Poured: 3,196 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
McDowell Mountain Ranch Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 MMR.jpgLocation: Scottsdale, AZ \ G.C.: Rytan Construction \ Date Completed: 2007 \ Cubic Yards Poured: 3,196 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
McDowell Mountain Ranch Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 MMR.jpgLocation: Scottsdale, AZ \ G.C.: Rytan Construction \ Date Completed: 2007 \ Cubic Yards Poured: 3,196 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
McDowell Mountain Ranch Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/11 MMR.jpgLocation: Scottsdale, AZ \ G.C.: Rytan Construction \ Date Completed: 2007 \ Cubic Yards Poured: 3,196 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
McDowell Mountain Ranch Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/12 MMR.jpgLocation: Scottsdale, AZ \ G.C.: Rytan Construction \ Date Completed: 2007 \ Cubic Yards Poured: 3,196 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
McDowell Mountain Ranch Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/10 MMR.jpgLocation: Scottsdale, AZ \ G.C.: Rytan Construction \ Date Completed: 2007 \ Cubic Yards Poured: 3,196 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Cardinal Health MPS Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Cardinal.jpgLocation: Chandler, AZ \ G.C.: C.F. Jordan \ Date Completed: 2006 \ Cubic Yards Poured: 13,930 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Cardinal Health MPS Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Cardinal.jpgLocation: Chandler, AZ \ G.C.: C.F. Jordan \ Date Completed: 2006 \ Cubic Yards Poured: 13,930 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
McDowell Mountain Ranch Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/13 MMR.jpgLocation: Scottsdale, AZ \ G.C.: Rytan Construction \ Date Completed: 2007 \ Cubic Yards Poured: 3,196 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Cardinal Health MPS Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Cardinal.jpgLocation: Chandler, AZ \ G.C.: C.F. Jordan \ Date Completed: 2006 \ Cubic Yards Poured: 13,930 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Cardinal Health MPS Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Cardinal.jpgLocation: Chandler, AZ \ G.C.: C.F. Jordan \ Date Completed: 2006 \ Cubic Yards Poured: 13,930 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
McDowell Mountain Ranch Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/9 MMR.jpgLocation: Scottsdale, AZ \ G.C.: Rytan Construction \ Date Completed: 2007 \ Cubic Yards Poured: 3,196 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Cardinal Health MPS Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 Cardinal.jpgLocation: Chandler, AZ \ G.C.: C.F. Jordan \ Date Completed: 2006 \ Cubic Yards Poured: 13,930 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Cardinal Health MPS Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 Cardinal.jpgLocation: Chandler, AZ \ G.C.: C.F. Jordan \ Date Completed: 2006 \ Cubic Yards Poured: 13,930 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Cardinal Health MPS Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 Cardinal.jpgLocation: Chandler, AZ \ G.C.: C.F. Jordan \ Date Completed: 2006 \ Cubic Yards Poured: 13,930 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Cardinal Health MPS Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 Cardinal.jpgLocation: Chandler, AZ \ G.C.: C.F. Jordan \ Date Completed: 2006 \ Cubic Yards Poured: 13,930 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Cardinal Health MPS Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/9 Cardinal.jpgLocation: Chandler, AZ \ G.C.: C.F. Jordan \ Date Completed: 2006 \ Cubic Yards Poured: 13,930 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Glendale Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 GAC.jpgLocation: Glendale, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,658 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Glendale Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 GAC.jpgLocation: Glendale, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,658 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Glendale Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 GSC.jpgLocation: Glendale, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,658 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Glendale Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 GAC.jpgLocation: Glendale, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,658 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Glendale Aquatic Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 GAC.jpgLocation: Glendale, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,658 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Thunderbird Self Storage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 TSS.jpgLocation: Peoria, AZ \ General Contractor: Howard S. Wright \ Date Completed: 2006 \ Cubic Yards Poured: 4,816 \ Services: Footings, Flatwork, Slab on Deck, Place & Finish, Sitework
-
Thunderbird Self Storage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 TSS.jpgLocation: Peoria, AZ \ General Contractor: Howard S. Wright \ Date Completed: 2006 \ Cubic Yards Poured: 4,816 \ Services: Footings, Flatwork, Slab on Deck, Place & Finish, Sitework
-
Blackstone Clubhouse @ Vistancia
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Blackstone.jpgLocation: Peoria, AZ \ G.C.: Wespac Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,428 \ Services: Footings, Flatwork, Place & Finish, Sistework
-
Blackstone Clubhouse @ Vistancia
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Blackstone.jpgLocation: Peoria, AZ \ G.C.: Wespac Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,428 \ Services: Footings, Flatwork, Place & Finish, Sistework
-
Blackstone Clubhouse @ Vistancia
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Blackstone.jpgLocation: Peoria, AZ \ G.C.: Wespac Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,428 \ Services: Footings, Flatwork, Place & Finish, Sistework
-
Blackstone Clubhouse @ Vistancia
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Blackstone.jpgLocation: Peoria, AZ \ G.C.: Wespac Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,428 \ Services: Footings, Flatwork, Place & Finish, Sistework
-
Blackstone Clubhouse @ Vistancia
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 Blackstone.jpgLocation: Peoria, AZ \ G.C.: Wespac Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,428 \ Services: Footings, Flatwork, Place & Finish, Sistework
-
Blackstone Clubhouse @ Vistancia
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 Blackstone.jpgLocation: Peoria, AZ \ G.C.: Wespac Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,428 \ Services: Footings, Flatwork, Place & Finish, Sistework
-
Blackstone Clubhouse @ Vistancia
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 Blackstone.jpgLocation: Peoria, AZ \ G.C.: Wespac Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,428 \ Services: Footings, Flatwork, Place & Finish, Sistework
-
Blackstone Clubhouse @ Vistancia
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 Blackstone.jpgLocation: Peoria, AZ \ G.C.: Wespac Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,428 \ Services: Footings, Flatwork, Place & Finish, Sistework
-
NAU Biology Building
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 NAU Biology.jpgLocation: Flagstaff, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 6,542 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
NAU Biology Building
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 NAU Biology.jpgLocation: Flagstaff, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 6,542 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
NAU Biology Building
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 NAU Biology.jpgLocation: Flagstaff, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 6,542 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
NAU Biology Building
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 NAU Biology.jpgLocation: Flagstaff, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 6,542 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
NAU Biology Building
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 NAU Biology.jpgLocation: Flagstaff, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 6,542 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
NAU Biology Building
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 NAU Biology.jpgLocation: Flagstaff, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 6,542 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
NAU Biology Building
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 NAU Biology.jpgLocation: Flagstaff, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 6,542 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
West 101 Business Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 West 101.jpgLocation: Phoenix, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2006 \ Cubic Yards Poured: 5,080 \ Services: Footings, Flatwork, Tilt-Up, Place & Finish, Sitework
-
West 101 Business Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 West 101.jpgLocation: Phoenix, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2006 \ Cubic Yards Poured: 5,080 \ Services: Footings, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Fairmont Princess
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Fairmont.jpgLocation: Scottsdale, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,921 \ Services: Footings, Flatwork, Place & Finish
-
Fairmont Princess
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Fairmont.jpgLocation: Scottsdale, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,921 \ Services: Footings, Flatwork, Place & Finish
-
Fairmont Princess
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Fairmont.jpgLocation: Scottsdale, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,921 \ Services: Footings, Flatwork, Place & Finish
-
Fairmont Princess
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Fairmont.jpgLocation: Scottsdale, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,921 \ Services: Footings, Flatwork, Place & Finish
-
Fairmont Princess
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 Fairmont.jpgLocation: Scottsdale, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,921 \ Services: Footings, Flatwork, Place & Finish
-
Fairmont Princess
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 Fairmont.jpgLocation: Scottsdale, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,921 \ Services: Footings, Flatwork, Place & Finish
-
Fairmont Princess
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 Fairmont.jpgLocation: Scottsdale, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,921 \ Services: Footings, Flatwork, Place & Finish
-
Fairmont Princess
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 Fairmont.jpgLocation: Scottsdale, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,921 \ Services: Footings, Flatwork, Place & Finish
-
Fairmont Princess
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/9 Fairmont.jpgLocation: Scottsdale, AZ \ G.C.: Holder Construction \ Date Completed: 2007 \ Cubic Yards Poured: 2,921 \ Services: Footings, Flatwork, Place & Finish
-
Coca-Cola Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 CC.jpgLocation: Glendale, AZ \ G. C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 7,303 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coca-Cola Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 CC.jpgLocation: Glendale, AZ \ G. C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 7,303 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coca-Cola Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 CC.jpgLocation: Glendale, AZ \ G. C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 7,303 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coca-Cola Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 CC.jpgLocation: Glendale, AZ \ G. C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 7,303 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coca-Cola Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 CC.jpgLocation: Glendale, AZ \ G. C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 7,303 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coca-Cola Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 CC.jpgLocation: Glendale, AZ \ G. C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 7,303 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coca-Cola Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 CC.jpgLocation: Glendale, AZ \ G. C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 7,303 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Lowe's Home Improvement & Pantano Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Lowes Pantano.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2006 \ Cubic Yards Poured: 7,153 \ Services: Footings, Caissons, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Coca-Cola Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 CC.jpgLocation: Glendale, AZ \ G. C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 7,303 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coca-Cola Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/9 CC.jpgLocation: Glendale, AZ \ G. C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 7,303 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coca-Cola Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/10 CC.jpgLocation: Glendale, AZ \ G. C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 7,303 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coca-Cola Distribution Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/11 CC.jpgLocation: Glendale, AZ \ G. C.: D.L. Withers Construction \ Date Completed: 2007 \ Cubic Yards Poured: 7,303 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Kino Healthcare
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Kino.jpgLocation: Tucson, AZ \ G.C.: Lloyd Construction \ Date Completed: 2007 \ Cubic Yards Poured: 5,400 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Kino Healthcare
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Kino.jpgLocation: Tucson, AZ \ G.C.: Lloyd Construction \ Date Completed: 2007 \ Cubic Yards Poured: 5,400 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Kino Healthcare
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Kino.jpgLocation: Tucson, AZ \ G.C.: Lloyd Construction \ Date Completed: 2007 \ Cubic Yards Poured: 5,400 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Kino Healthcare
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Kino.jpgLocation: Tucson, AZ \ G.C.: Lloyd Construction \ Date Completed: 2007 \ Cubic Yards Poured: 5,400 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Kino Healthcare
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 Kino.jpgLocation: Tucson, AZ \ G.C.: Lloyd Construction \ Date Completed: 2007 \ Cubic Yards Poured: 5,400 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Lowe's Home Improvement & Pantano Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Lowe's Pantano.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2006 \ Cubic Yards Poured: 7,153 \ Services: Footings, Caissons, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Lowe's Home Improvement & Pantano Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Lowe's Pantano.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2006 \ Cubic Yards Poured: 7,153 \ Services: Footings, Caissons, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Lowe's Home Improvement & Pantano Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Lowe's Pantano.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2006 \ Cubic Yards Poured: 7,153 \ Services: Footings, Caissons, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Lowe's Home Improvement & Pantano Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 Lowe's Pantano.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2006 \ Cubic Yards Poured: 7,153 \ Services: Footings, Caissons, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Lowe's Home Improvement & Pantano Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 Lowe's Pantano.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2006 \ Cubic Yards Poured: 7,153 \ Services: Footings, Caissons, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Lowe's Home Improvement & Pantano Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 Lowe's Pantano.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2006 \ Cubic Yards Poured: 7,153 \ Services: Footings, Caissons, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Lowe's Home Improvement & Pantano Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/9 Lowe's Pantano.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2006 \ Cubic Yards Poured: 7,153 \ Services: Footings, Caissons, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Lowe's Home Improvement & Pantano Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 Lowe's Pantano.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2006 \ Cubic Yards Poured: 7,153 \ Services: Footings, Caissons, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Lowe's Home Improvement & Pantano Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/10 Lowe's Pantano.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2006 \ Cubic Yards Poured: 7,153 \ Services: Footings, Caissons, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Lowe's Home Improvement & Pantano Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/11 Lowe's Pantano.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2006 \ Cubic Yards Poured: 7,153 \ Services: Footings, Caissons, Flatwork, Tilt-Up, Place & Finish, Sitework
-
The Park at San Tan
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Park at San Tan.jpgLocation: Chandler, AZ \ G.C.: The Weitz Company \ Date Completed: 2007 \ Cubic Yards Poured: 8,013 \ Services: Footings, Flatwork, Slab on Deck, Structural, Place & Finish
-
Lowe's Home Improvement & Pantano Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/12 Lowe's Pantan.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2006 \ Cubic Yards Poured: 7,153 \ Services: Footings, Caissons, Flatwork, Tilt-Up, Place & Finish, Sitework
-
The Park at San Tan
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Park at San Tan.jpgLocation: Chandler, AZ \ G.C.: The Weitz Company \ Date Completed: 2007 \ Cubic Yards Poured: 8,013 \ Services: Footings, Flatwork, Slab on Deck, Structural, Place & Finish
-
The Park at San Tan
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Park at San Tan.jpgLocation: Chandler, AZ \ G.C.: The Weitz Company \ Date Completed: 2007 \ Cubic Yards Poured: 8,013 \ Services: Footings, Flatwork, Slab on Deck, Structural, Place & Finish
-
Renaissance Hotel, Parking Garage, and Convention Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Ren.jpgLocation: Glendale, AZ \ G.C.: Killian Western \ Date Completed: 2008 \ Cubic Yards Poured: 15,356 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish
-
Renaissance Hotel, Parking Garage, and Convention Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Ren.jpgLocation: Glendale, AZ \ G.C.: Killian Western \ Date Completed: 2008 \ Cubic Yards Poured: 15,356 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish
-
Renaissance Hotel, Parking Garage, and Convention Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Ren.jpgLocation: Glendale, AZ \ G.C.: Killian Western \ Date Completed: 2008 \ Cubic Yards Poured: 15,356 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish
-
Renaissance Hotel, Parking Garage, and Convention Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Ren.jpgLocation: Glendale, AZ \ G.C.: Killian Western \ Date Completed: 2008 \ Cubic Yards Poured: 15,356 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish
-
Renaissance Hotel, Parking Garage, and Convention Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 Ren.jpgLocation: Glendale, AZ \ G.C.: Killian Western \ Date Completed: 2008 \ Cubic Yards Poured: 15,356 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish
-
Renaissance Hotel, Parking Garage, and Convention Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 Ren.jpgLocation: Glendale, AZ \ G.C.: Killian Western \ Date Completed: 2008 \ Cubic Yards Poured: 15,356 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish
-
Renaissance Hotel, Parking Garage, and Convention Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 Ren.jpgLocation: Glendale, AZ \ G.C.: Killian Western \ Date Completed: 2008 \ Cubic Yards Poured: 15,356 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish
-
Renaissance Hotel, Parking Garage, and Convention Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 Ren.jpgLocation: Glendale, AZ \ G.C.: Killian Western \ Date Completed: 2008 \ Cubic Yards Poured: 15,356 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish
-
Renaissance Hotel, Parking Garage, and Convention Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/9 Ren.jpgLocation: Glendale, AZ \ G.C.: Killian Western \ Date Completed: 2008 \ Cubic Yards Poured: 15,356 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish
-
Renaissance Hotel, Parking Garage, and Convention Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/11 Ren.jpgLocation: Glendale, AZ \ G.C.: Killian Western \ Date Completed: 2008 \ Cubic Yards Poured: 15,356 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish
-
Renaissance Hotel, Parking Garage, and Convention Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/10 Ren.jpgLocation: Glendale, AZ \ G.C.: Killian Western \ Date Completed: 2008 \ Cubic Yards Poured: 15,356 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish
-
Cave Creek Waste Transfer Station
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 Cave.jpgLocation: Phoenix, AZ \ General Contractor: Cambridge Builders \ Date Completed: 2007 \ Cubic Yards Poured: 4,453 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Cave Creek Waste Transfer Station
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 Cave.jpgLocation: Phoenix, AZ \ General Contractor: Cambridge Builders \ Date Completed: 2007 \ Cubic Yards Poured: 4,453 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Banner Medical Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Banner PG.jpgLocation: Mesa, AZ \ G.C.: DPR \ Date Completed: 2007 \ Cubic Yards Poured: 8,615 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Banner Medical Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Banner PG.jpgLocation: Mesa, AZ \ G.C.: DPR \ Date Completed: 2007 \ Cubic Yards Poured: 8,615 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Banner Medical Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Banner PG.jpgLocation: Mesa, AZ \ G.C.: DPR \ Date Completed: 2007 \ Cubic Yards Poured: 8,615 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Banner Medical Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Banner PG.jpgLocation: Mesa, AZ \ G.C.: DPR \ Date Completed: 2007 \ Cubic Yards Poured: 8,615 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Banner Medical Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 Banner PG.jpgLocation: Mesa, AZ \ G.C.: DPR \ Date Completed: 2007 \ Cubic Yards Poured: 8,615 \ Services: Footings, Flatwork, Structural, Place & Finish
-
ASU Research Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 ASU RP.jpgLocation: Tempe, AZ \ G.C.: McGough \ Date Completed: 2008 \ Cubic Yards Poured: 2,887 \ Services: Footing, Flatwork, Tilt-Up, Place & Finish
-
ASU Research Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 ASU RP.jpgLocation: Tempe, AZ \ G.C.: McGough \ Date Completed: 2008 \ Cubic Yards Poured: 2,887 \ Services: Footing, Flatwork, Tilt-Up, Place & Finish
-
ASU Research Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 ASU RP.jpgLocation: Tempe, AZ \ G.C.: McGough \ Date Completed: 2008 \ Cubic Yards Poured: 2,887 \ Services: Footing, Flatwork, Tilt-Up, Place & Finish
-
ASU Research Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 ASU RP.jpgLocation: Tempe, AZ \ G.C.: McGough \ Date Completed: 2008 \ Cubic Yards Poured: 2,887 \ Services: Footing, Flatwork, Tilt-Up, Place & Finish
-
ASU Research Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 ASU RP.jpgLocation: Tempe, AZ \ G.C.: McGough \ Date Completed: 2008 \ Cubic Yards Poured: 2,887 \ Services: Footing, Flatwork, Tilt-Up, Place & Finish
-
ASU Research Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 ASU RP.jpgLocation: Tempe, AZ \ G.C.: McGough \ Date Completed: 2008 \ Cubic Yards Poured: 2,887 \ Services: Footing, Flatwork, Tilt-Up, Place & Finish
-
Desert Ridge Community Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/wwm_538.jpgLocation: Phoenix, AZ \ G.C: Summit Builders \ Date Completed: 2008 \ Cubic Yards Poured: 1,220 \ Services: Footing, Flatwork, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/9 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/10 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coronado High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Coronado HR.jpgLocation: Scottsdale, AZ \ G.C.: Adolfson & Peterson \ Date Completed: 2009 \ Cubic Yards Poured: 6,895 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/12 Lowe's scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coronado High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Coronado HS.jpgLocation: Scottsdale, AZ \ G.C.: Adolfson & Peterson \ Date Completed: 2009 \ Cubic Yards Poured: 6,895 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/13 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coronado High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Coronado HS.jpgLocation: Scottsdale, AZ \ G.C.: Adolfson & Peterson \ Date Completed: 2009 \ Cubic Yards Poured: 6,895 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/11 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Lowe's of Scottsdale
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/14 Lowe's Scott.jpgLocation: Scottsdale, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2007 \ Cubic Yards Poured: 8,408 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Coronado High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Coronado HS.jpgLocation: Scottsdale, AZ \ G.C.: Adolfson & Peterson \ Date Completed: 2009 \ Cubic Yards Poured: 6,895 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Coronado High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 Coronado H.jpgLocation: Scottsdale, AZ \ G.C.: Adolfson & Peterson \ Date Completed: 2009 \ Cubic Yards Poured: 6,895 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Coronado High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 Coronado HS.jpgLocation: Scottsdale, AZ \ G.C.: Adolfson & Peterson \ Date Completed: 2009 \ Cubic Yards Poured: 6,895 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Coronado High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 Coronado HS.jpgLocation: Scottsdale, AZ \ G.C.: Adolfson & Peterson \ Date Completed: 2009 \ Cubic Yards Poured: 6,895 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Coronado High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 Coronado HS.jpgLocation: Scottsdale, AZ \ G.C.: Adolfson & Peterson \ Date Completed: 2009 \ Cubic Yards Poured: 6,895 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
NAU Conference Center & Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 NAU CC.jpgLocation: Flagstaff, AZ \ G.C.: Ryan Companies \ Date Completed: 2009 \ Cubic Yards Poured: 3,676 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
NAU Conference Center & Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 NAU CC.jpgLocation: Flagstaff, AZ \ G.C.: Ryan Companies \ Date Completed: 2009 \ Cubic Yards Poured: 3,676 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Tempe Transportation Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 TTC.jpgLocation: Tempe, AZ \ G.C.: Adolfson & Peterson \ Date Completed: 2009 \ Cubic Yards Poured: 3,344 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Tempe Transportation Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 TTC.jpgLocation: Tempe, AZ \ G.C.: Adolfson & Peterson \ Date Completed: 2009 \ Cubic Yards Poured: 3,344 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Tempe Transportation Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 TTC.jpgLocation: Tempe, AZ \ G.C.: Adolfson & Peterson \ Date Completed: 2009 \ Cubic Yards Poured: 3,344 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Tempe Transportation Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 TTC.jpgLocation: Tempe, AZ \ G.C.: Adolfson & Peterson \ Date Completed: 2009 \ Cubic Yards Poured: 3,344 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Canyon Village at DC Ranch
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Canyon Village.jpgLocation: Scottsdale, AZ \ G.C: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 5,547 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Canyon Village at DC Ranch
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Canyon Village.jpgLocation: Scottsdale, AZ \ G.C: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 5,547 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Canyon Village at DC Ranch
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Canyon Villag.jpgLocation: Scottsdale, AZ \ G.C: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 5,547 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Canyon Village at DC Ranch
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Canyon Villag.jpgLocation: Scottsdale, AZ \ G.C: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 5,547 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Canyon Village at DC Ranch
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 Canyon Village.jpgLocation: Scottsdale, AZ \ G.C: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 5,547 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Canyon Village at DC Ranch
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 Canyon Village.jpgLocation: Scottsdale, AZ \ G.C: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 5,547 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Canyon Village at DC Ranch
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 Canyon Village.jpgLocation: Scottsdale, AZ \ G.C: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 5,547 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Canyon Village at DC Ranch
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 Canyon Village.jpgLocation: Scottsdale, AZ \ G.C: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 5,547 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Canyon Village at DC Ranch
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/9 Canyon Village.jpgLocation: Scottsdale, AZ \ G.C: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 5,547 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Canyon Village at DC Ranch
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/10 Canyon Village.jpgLocation: Scottsdale, AZ \ G.C: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 5,547 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Chandler Heights Recharge
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 CHR.jpgLocation: Chandler, AZ \ G.C.: M.A. Mortenson \ Date Completed: 2007 \ Cubic Yards Poured: 1,333 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Chandler Heights Recharge
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 chr.jpgLocation: Chandler, AZ \ G.C.: M.A. Mortenson \ Date Completed: 2007 \ Cubic Yards Poured: 1,333 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Chandler Heights Recharge
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 chr.jpgLocation: Chandler, AZ \ G.C.: M.A. Mortenson \ Date Completed: 2007 \ Cubic Yards Poured: 1,333 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Chandler Heights Recharge
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 chr.jpgLocation: Chandler, AZ \ G.C.: M.A. Mortenson \ Date Completed: 2007 \ Cubic Yards Poured: 1,333 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
ASU Polytechnic Classroom
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 asu poly.jpgLocation: Mesa, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 3,969 \ Services: Flatwork, Slab on Deck, Place & Finish
-
ASU Polytechnic Classroom
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 asu poly.jpgLocation: Mesa, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 3,969 \ Services: Flatwork, Slab on Deck, Place & Finish
-
ASU Polytechnic Classroom
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 asu poly.jpgLocation: Mesa, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 3,969 \ Services: Flatwork, Slab on Deck, Place & Finish
-
ASU Polytechnic Classroom
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 asu poly.jpgLocation: Mesa, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 3,969 \ Services: Flatwork, Slab on Deck, Place & Finish
-
ASU Polytechnic Classroom
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 asu poly.jpgLocation: Mesa, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 3,969 \ Services: Flatwork, Slab on Deck, Place & Finish
-
ASU Polytechnic Classroom
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 asu poly.jpgLocation: Mesa, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 3,969 \ Services: Flatwork, Slab on Deck, Place & Finish
-
ASU Polytechnic Classroom
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 asu poly.jpgLocation: Mesa, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 3,969 \ Services: Flatwork, Slab on Deck, Place & Finish
-
ASU Polytechnic Classroom
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 asu poly.jpgLocation: Mesa, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 3,969 \ Services: Flatwork, Slab on Deck, Place & Finish
-
Roger Road Storm Water Basin
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 RRSWB.jpgLocation: Tucson, AZ \ G.C.: Qwest Civil Contractors \ Date Completed: 2007 \ Cubic Yards Poured: 2,405 \ Services: Footings, Structural, Place & Finish, Sitework
-
Roger Road Storm Water Basin
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 RRSWB.jpgLocation: Tucson, AZ \ G.C.: Qwest Civil Contractors \ Date Completed: 2007 \ Cubic Yards Poured: 2,405 \ Services: Footings, Structural, Place & Finish, Sitework
-
Scottsdale Auto Salon
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 sas.jpgLocation: Scottsdale, AZ \ G.C.: RTM Commercial Builders \ Date Completed: 2008 \ Cubic Yards Poured: 2,053 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Scottsdale Auto Salon
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 sas.jpgLocation: Scottsdale, AZ \ G.C.: RTM Commercial Builders \ Date Completed: 2008 \ Cubic Yards Poured: 2,053 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Scottsdale Auto Salon
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 sas.jpgLocation: Scottsdale, AZ \ G.C.: RTM Commercial Builders \ Date Completed: 2008 \ Cubic Yards Poured: 2,053 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Scottsdale Auto Salon
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 sas.jpgLocation: Scottsdale, AZ \ G.C.: RTM Commercial Builders \ Date Completed: 2008 \ Cubic Yards Poured: 2,053 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Kohl's - Anthem
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 kohls.jpgLocation: Anthem, AZ \ G.C.: Howard S. Wright Construction \ Date Completed: 2008 \ Cubic Yards Poured: 3,509 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Kohl's - Anthem
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 kohls.jpgLocation: Anthem, AZ \ G.C.: Howard S. Wright Construction \ Date Completed: 2008 \ Cubic Yards Poured: 3,509 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Kohl's - Anthem
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 kohls.jpgLocation: Anthem, AZ \ G.C.: Howard S. Wright Construction \ Date Completed: 2008 \ Cubic Yards Poured: 3,509 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Kohl's - Anthem
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 kohls.jpgLocation: Anthem, AZ \ G.C.: Howard S. Wright Construction \ Date Completed: 2008 \ Cubic Yards Poured: 3,509 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Kohl's - Anthem
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 kohls.jpgLocation: Anthem, AZ \ G.C.: Howard S. Wright Construction \ Date Completed: 2008 \ Cubic Yards Poured: 3,509 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Kohl's - Anthem
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 kohls.jpgLocation: Anthem, AZ \ G.C.: Howard S. Wright Construction \ Date Completed: 2008 \ Cubic Yards Poured: 3,509 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Quick Trip Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 QT.jpgLocation: Tolleson, AZ \ G.C.: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 4,465 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Quick Trip Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 QT.jpgLocation: Tolleson, AZ \ G.C.: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 4,465 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Quick Trip Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 QT.jpgLocation: \ Year Started: \ General Contractor: \ Date Completed: \ Cubic Yards Poured:
-
Quick Trip Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 QT.jpgLocation: Tolleson, AZ \ G.C.: Ryan Companies \ Date Completed: 2008 \ Cubic Yards Poured: 4,465 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish, Sitework
-
Walmart Supercenter #1533
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 walmart peoria.jpgLocation: Peoria, AZ \ G.C.: Colorado Structures \ Date Completed: 2008 \ Cubic Yards Poured: 5,442 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Walmart Supercenter #1533
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 walmart peoria.jpgLocation: Peoria, AZ \ G.C.: Colorado Structures \ Date Completed: 2008 \ Cubic Yards Poured: 5,442 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Walmart Supercenter #1533
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 walmart peoria.jpgLocation: Peoria, AZ \ G.C.: Colorado Structures \ Date Completed: 2008 \ Cubic Yards Poured: 5,442 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Walmart Supercenter #1533
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 walmart peoria.jpgLocation: Peoria, AZ \ G.C.: Colorado Structures \ Date Completed: 2008 \ Cubic Yards Poured: 5,442 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Walmart Supercenter #1533
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 walmart peoria.jpgLocation: Peoria, AZ \ G.C.: Colorado Structures \ Date Completed: 2008 \ Cubic Yards Poured: 5,442 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Walmart Supercenter #1533
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 walmart peoria.jpgLocation: Peoria, AZ \ G.C.: Colorado Structures \ Date Completed: 2008 \ Cubic Yards Poured: 5,442 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Walmart Supercenter #1533
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 walmart peoria.jpgLocation: Peoria, AZ \ G.C.: Colorado Structures \ Date Completed: 2008 \ Cubic Yards Poured: 5,442 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Walmart Supercenter #1533
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 walmart peoria.jpgLocation: Peoria, AZ \ G.C.: Colorado Structures \ Date Completed: 2008 \ Cubic Yards Poured: 5,442 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Gilbert Business Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 gilbus.jpgLocation: Gilbert, AZ \ G.C.: Suft Construction \ Date Completed: 2008 \ Cubic Yards Poured: 2,800 \ Services: Footings, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Gilbert Business Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 gilbus.jpgLocation: Gilbert, AZ \ G.C.: Suft Construction \ Date Completed: 2008 \ Cubic Yards Poured: 2,800 \ Services: Footings, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Gilbert Business Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 gilbus.jpgLocation: Gilbert, AZ \ G.C.: Suft Construction \ Date Completed: 2008 \ Cubic Yards Poured: 2,800 \ Services: Footings, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Gilbert Business Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 gilbus.jpgLocation: Gilbert, AZ \ G.C.: Suft Construction \ Date Completed: 2008 \ Cubic Yards Poured: 2,800 \ Services: Footings, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Gilbert Business Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 gilbus.jpgLocation: Gilbert, AZ \ G.C.: Suft Construction \ Date Completed: 2008 \ Cubic Yards Poured: 2,800 \ Services: Footings, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Gilbert Business Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 gilbus.jpgLocation: Gilbert, AZ \ G.C.: Suft Construction \ Date Completed: 2008 \ Cubic Yards Poured: 2,800 \ Services: Footings, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Gilbert Business Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 gilbus.jpgLocation: Gilbert, AZ \ G.C.: Suft Construction \ Date Completed: 2008 \ Cubic Yards Poured: 2,800 \ Services: Footings, Flatwork, Tilt-Up, Place & Finish, Sitework
-
Tramonto Marketplace
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 tram.jpgLocation: Phoenix, AZ \ G.C.: Colorado Structures \ Date Completed: 2009 \ Cubic Yards Poured: 4,685 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Tramonto Marketplace
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 tram.jpgLocation: Phoenix, AZ \ G.C.: Colorado Structures \ Date Completed: 2009 \ Cubic Yards Poured: 4,685 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Tramonto Marketplace
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 tram.jpgLocation: Phoenix, AZ \ G.C.: Colorado Structures \ Date Completed: 2009 \ Cubic Yards Poured: 4,685 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Tramonto Marketplace
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 tram.jpgLocation: Phoenix, AZ \ G.C.: Colorado Structures \ Date Completed: 2009 \ Cubic Yards Poured: 4,685 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Tramonto Marketplace
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 tram.jpgLocation: Phoenix, AZ \ G.C.: Colorado Structures \ Date Completed: 2009 \ Cubic Yards Poured: 4,685 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Tramonto Marketplace
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 tram.jpgLocation: Phoenix, AZ \ G.C.: Colorado Structures \ Date Completed: 2009 \ Cubic Yards Poured: 4,685 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Tramonto Marketplace
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 tram.jpgLocation: Phoenix, AZ \ G.C.: Colorado Structures \ Date Completed: 2009 \ Cubic Yards Poured: 4,685 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Tramonto Marketplace
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 tram.jpgLocation: Phoenix, AZ \ G.C.: Colorado Structures \ Date Completed: 2009 \ Cubic Yards Poured: 4,685 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Buckeye Hills Shooting Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/053.jpgLocation: Buckeye, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2008 \ Cubic Yards Poured: 2,520 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Buckeye Hills Shooting Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/range_lg.jpgLocation: Buckeye, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2008 \ Cubic Yards Poured: 2,520 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Buckeye Hills Shooting Park
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/range2_lg.jpgLocation: Buckeye, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2008 \ Cubic Yards Poured: 2,520 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Spa 3
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Image 1b.jpgLocation: Surprise, AZ \ G.C.: PERC \ Date Completed: 2008 \ Cubic Yards Poured: 3,958 \ Services: Flatwork, Structural, Place & Finish
-
Spa 3
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Image 2b.jpgLocation: Surprise, AZ \ G.C.: PERC \ Date Completed: 2008 \ Cubic Yards Poured: 3,958 \ Services: Flatwork, Structural, Place & Finish
-
Spa 3
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Image 5b.jpgLocation: Surprise, AZ \ G.C.: PERC \ Date Completed: 2008 \ Cubic Yards Poured: 3,958 \ Services: Flatwork, Structural, Place & Finish
-
Deer Valley Medical Center & Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 DVMC.jpgLocation: Phoenix, AZ \ G.C.: The Weitz Company \ Date Completed: 2008 \ Cubic Yards Poured: 4,319 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Deer Valley Medical Center & Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 dvmc.jpgLocation: Phoenix, AZ \ G.C.: The Weitz Company \ Date Completed: 2008 \ Cubic Yards Poured: 4,319 \ Services: Footings, Flatwork, Structural, Place
-
Deer Valley Medical Center & Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 dvmc.jpgLocation: Phoenix, AZ \ G.C.: The Weitz Company \ Date Completed: 2008 \ Cubic Yards Poured: 4,319 \ Services: Footings, Flatwork, Structural, Place
-
Deer Valley Medical Center & Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 dvmc.jpgLocation: Phoenix, AZ \ G.C.: The Weitz Company \ Date Completed: 2008 \ Cubic Yards Poured: 4,319 \ Services: Footings, Flatwork, Structural, Place
-
Deer Valley Medical Center & Parking Garage
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 dvmc.jpgLocation: Phoenix, AZ \ G.C.: The Weitz Company \ Date Completed: 2008 \ Cubic Yards Poured: 4,319 \ Services: Footings, Flatwork, Structural, Place
-
Mesa Police Technical Services
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Mesa Police.jpgLocation: Mesa, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2009 \ Cubic Yards Poured: 1,800 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Mesa Police Technical Services
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 mesa police.jpgLocation: Mesa, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2009 \ Cubic Yards Poured: 1,800 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Mesa Police Technical Services
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 mesa police.jpgLocation: Mesa, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2009 \ Cubic Yards Poured: 1,800 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Covance Development Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 covance.jpgLocation: Chandler, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 14,222 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish, Sitework
-
Covance Development Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 covance.jpgLocation: Chandler, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 14,222 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish, Sitework
-
Covance Development Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 covance.jpgLocation: Chandler, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 14,222 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish, Sitework
-
Covance Development Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 covance.jpgLocation: Chandler, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 14,222 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish, Sitework
-
Covance Development Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 covance.jpgLocation: Chandler, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 14,222 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish, Sitework
-
Covance Development Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 covance.jpgLocation: Chandler, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 14,222 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish, Sitework
-
Covance Development Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 covance.jpgLocation: Chandler, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 14,222 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish, Sitework
-
Covance Development Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 covance.jpgLocation: Chandler, AZ \ G.C.: DPR Construction \ Date Completed: 2009 \ Cubic Yards Poured: 14,222 \ Services: Footings, Flatwork, Structural, Slab on Deck, Place & Finish, Sitework
-
Estrella Community Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 estrella cc.jpgLocation: Goodyear, AZ \ G.C.: Engel Homes \ Date Completed: 2008 \ Cubic Yards Poured: 3,498 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Estrella Community Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1a estrella cc.jpgLocation: Goodyear, AZ \ G.C.: Engel Homes \ Date Completed: 2008 \ Cubic Yards Poured: 3,498 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Estrella Community Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 estrella cc.jpgLocation: Goodyear, AZ \ G.C.: Engel Homes \ Date Completed: 2008 \ Cubic Yards Poured: 3,498 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Estrella Community Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 estrella cc.jpgLocation: Goodyear, AZ \ G.C.: Engel Homes \ Date Completed: 2008 \ Cubic Yards Poured: 3,498 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Estrella Community Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 estrella cc.jpgLocation: Goodyear, AZ \ G.C.: Engel Homes \ Date Completed: 2008 \ Cubic Yards Poured: 3,498 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Estrella Community Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 estrella cc.jpgLocation: Goodyear, AZ \ G.C.: Engel Homes \ Date Completed: 2008 \ Cubic Yards Poured: 3,498 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Estrella Community Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 estrella cc.jpgLocation: Goodyear, AZ \ G.C.: Engel Homes \ Date Completed: 2008 \ Cubic Yards Poured: 3,498 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Estrella Community Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 estrella cc.jpgLocation: Goodyear, AZ \ G.C.: Engel Homes \ Date Completed: 2008 \ Cubic Yards Poured: 3,498 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Estrella Community Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/9 estrella cc.jpgLocation: Goodyear, AZ \ G.C.: Engel Homes \ Date Completed: 2008 \ Cubic Yards Poured: 3,498 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Lone Butte Gila River Casino
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 lone butte.jpgLocation: Chandler, AZ \ G.C.: JE Dunn Construction \ Date Completed: 2009 \ Cubic Yards Poured: 2,481 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Lone Butte Gila River Casino
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 lone butte.jpgLocation: Chandler, AZ \ G.C.: JE Dunn Construction \ Date Completed: 2009 \ Cubic Yards Poured: 2,481 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Lone Butte Gila River Casino
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 lone butte.jpgLocation: Chandler, AZ \ G.C.: JE Dunn Construction \ Date Completed: 2009 \ Cubic Yards Poured: 2,481 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Lone Butte Gila River Casino
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 lone butte.jpgLocation: Chandler, AZ \ G.C.: JE Dunn Construction \ Date Completed: 2009 \ Cubic Yards Poured: 2,481 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Lone Butte Gila River Casino
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 Lone Butte.jpgLocation: Chandler, AZ \ G.C.: JE Dunn Construction \ Date Completed: 2009 \ Cubic Yards Poured: 2,481 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Lone Butte Gila River Casino
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 lone butte.jpgLocation: Chandler, AZ \ G.C.: JE Dunn Construction \ Date Completed: 2009 \ Cubic Yards Poured: 2,481 \ Services: Footings, Flatwork, Structural, Place & Finish
-
Costco - Mesa
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Costco mesa.jpgLocation: Mesa, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2008 \ Cubic Yards Poured: 5,650 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Costco - Mesa
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 costco mesa.jpgLocation: Mesa, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2008 \ Cubic Yards Poured: 5,650 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Costco - Mesa
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 costco mesa.jpgLocation: Mesa, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2008 \ Cubic Yards Poured: 5,650 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Costco - Mesa
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 costco mesa.jpgLocation: Mesa, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2008 \ Cubic Yards Poured: 5,650 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Costco - Mesa
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 costco mesa.jpgLocation: Mesa, AZ \ G.C.: Jackson Dean Construction \ Date Completed: 2008 \ Cubic Yards Poured: 5,650 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Reach 11 Recreational Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 reach 11.jpgLocation: Phoenix, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2009 \ Cubic Yards Poured: 2,528 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Reach 11 Recreational Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 reach 11.jpgLocation: Phoenix, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2009 \ Cubic Yards Poured: 2,528 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Reach 11 Recreational Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 reach 11.jpgLocation: Phoenix, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2009 \ Cubic Yards Poured: 2,528 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Reach 11 Recreational Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 reach 11.jpgLocation: Phoenix, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2009 \ Cubic Yards Poured: 2,528 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Reach 11 Recreational Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 reach 11.jpgLocation: Phoenix, AZ \ G.C.: D.L. Withers Construction \ Date Completed: 2009 \ Cubic Yards Poured: 2,528 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Sundance WRF Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Image 1.jpgLocation: Buckeye, AZ \ G.C.: PERC \ Date Completed: 2009 \ Cubic Yards Poured: 5,160 \ Services: Flatwork, Structural, Place & Finish
-
Sundance WRF Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Image 2.jpgLocation: Buckeye, AZ \ G.C.: PERC \ Date Completed: 2009 \ Cubic Yards Poured: 5,160 \ Services: Flatwork, Structural, Place & Finish
-
Sundance WRF Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Image 3.jpgLocation: Buckeye, AZ \ G.C.: PERC \ Date Completed: 2009 \ Cubic Yards Poured: 5,160 \ Services: Flatwork, Structural, Place & Finish
-
Sundance WRF Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Image 4.jpgLocation: Buckeye, AZ \ G.C.: PERC \ Date Completed: 2009 \ Cubic Yards Poured: 5,160 \ Services: Flatwork, Structural, Place & Finish
-
Sundance WRF Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Image 5.jpgLocation: Buckeye, AZ \ G.C.: PERC \ Date Completed: 2009 \ Cubic Yards Poured: 5,160 \ Services: Flatwork, Structural, Place & Finish
-
Sundance WRF Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Image 6.jpgLocation: Buckeye, AZ \ G.C.: PERC \ Date Completed: 2009 \ Cubic Yards Poured: 5,160 \ Services: Flatwork, Structural, Place & Finish
-
Sundance WRF Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Sundance 035.jpgLocation: Buckeye, AZ \ G.C.: PERC \ Date Completed: 2009 \ Cubic Yards Poured: 5,160 \ Services: Flatwork, Structural, Place & Finish
-
Sundance WRF Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Sundance 038.jpgLocation: Buckeye, AZ \ G.C.: PERC \ Date Completed: 2009 \ Cubic Yards Poured: 5,160 \ Services: Flatwork, Structural, Place & Finish
-
Sundance WRF Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Sundance 051.jpgLocation: Buckeye, AZ \ G.C.: PERC \ Date Completed: 2009 \ Cubic Yards Poured: 5,160 \ Services: Flatwork, Structural, Place & Finish
-
University of Arizona ICA Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/ICA 1.jpgLocation: Tucson, AZ \ G.C.: Lloyd Construction \ Date Completed: 2009 \ Cubic Yards Poured: 4,838 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
University of Arizona ICA Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/ICA 2.jpgLocation: Tucson, AZ \ G.C.: Lloyd Construction \ Date Completed: 2009 \ Cubic Yards Poured: 4,838 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
University of Arizona ICA Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/ICA 3.jpgLocation: Tucson, AZ \ G.C.: Lloyd Construction \ Date Completed: 2009 \ Cubic Yards Poured: 4,838 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
University of Arizona ICA Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/ICA 4.jpgLocation: Tucson, AZ \ G.C.: Lloyd Construction \ Date Completed: 2009 \ Cubic Yards Poured: 4,838 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
University of Arizona ICA Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/ICA 5.jpgLocation: Tucson, AZ \ G.C.: Lloyd Construction \ Date Completed: 2009 \ Cubic Yards Poured: 4,838 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
University of Arizona ICA Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/ICA 6.jpgLocation: Tucson, AZ \ G.C.: Lloyd Construction \ Date Completed: 2009 \ Cubic Yards Poured: 4,838 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
University of Arizona ICA Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/ICA 7.jpgLocation: Tucson, AZ \ G.C.: Lloyd Construction \ Date Completed: 2009 \ Cubic Yards Poured: 4,838 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Desert Toyota
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/desert toyota 1.jpgLocation: Tucson, AZ \ G.C.: Johnson Carlier \ Date Completed: 2009 \ Cubic Yards Poured: 7,813 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Desert Toyota
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/desert toyota 2.jpgLocation: Tucson, AZ \ G.C.: Johnson Carlier \ Date Completed: 2009 \ Cubic Yards Poured: 7,813 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Desert Toyota
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/desert toyota 3.jpgLocation: Tucson, AZ \ G.C.: Johnson Carlier \ Date Completed: 2009 \ Cubic Yards Poured: 7,813 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Desert Toyota
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/desert toyota 4.jpgLocation: Tucson, AZ \ G.C.: Johnson Carlier \ Date Completed: 2009 \ Cubic Yards Poured: 7,813 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Desert Toyota
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/desert toyota 5.jpgLocation: Tucson, AZ \ G.C.: Johnson Carlier \ Date Completed: 2009 \ Cubic Yards Poured: 7,813 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Desert Toyota
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/desert toyota 6.jpgLocation: Tucson, AZ \ G.C.: Johnson Carlier \ Date Completed: 2009 \ Cubic Yards Poured: 7,813 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Homewood Suites
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/homewood 1.jpgLocation: Phoenix, AZ \ G.C.: Layton Companies \ Date Completed: 2009 \ Cubic Yards Poured: 1,869 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Homewood Suites
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/homewood 2.jpgLocation: Phoenix, AZ \ G.C.: Layton Companies \ Date Completed: 2009 \ Cubic Yards Poured: 1,869 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Homewood Suites
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/homewood 3.jpgLocation: Phoenix, AZ \ G.C.: Layton Companies \ Date Completed: 2009 \ Cubic Yards Poured: 1,869 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
La Casa De Cristo Church Fellowship Hall Addition
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/la casa 1.jpgLocation: Scottsdale, AZ \ G.C.: Redden Construction \ Date Completed: 2009 \ Cubic Yards Poured: 895 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
La Casa De Cristo Church Fellowship Hall Addition
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/la casa 2.jpgLocation: Scottsdale, AZ \ G.C.: Redden Construction \ Date Completed: 2009 \ Cubic Yards Poured: 895 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
La Casa De Cristo Church Fellowship Hall Addition
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/la casa 3.jpgLocation: Scottsdale, AZ \ G.C.: Redden Construction \ Date Completed: 2009 \ Cubic Yards Poured: 895 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Courtyard by Marriott
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Courtyard 1.jpgLocation: Chandler, AZ \ G.C.: Killian-Western \ Date Completed: 2010 \ Cubic Yards Poured: 3,892 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Courtyard by Marriott
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Courtyard 2.jpgLocation: Chandler, AZ \ G.C.: Killian-Western \ Date Completed: 2010 \ Cubic Yards Poured: 3,892 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Courtyard by Marriott
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Courtyard 3.jpgLocation: Chandler, AZ \ G.C.: Killian-Western \ Date Completed: 2010 \ Cubic Yards Poured: 3,892 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Courtyard by Marriott
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/Courtyard 4.jpgLocation: Chandler, AZ \ G.C.: Killian-Western \ Date Completed: 2010 \ Cubic Yards Poured: 3,892 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Courtyard by Marriott
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/courtyard 5.jpgLocation: Chandler, AZ \ G.C.: Killian-Western \ Date Completed: 2010 \ Cubic Yards Poured: 3,892 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Courtyard by Marriott
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/courtyard 6.jpgLocation: Chandler, AZ \ G.C.: Killian-Western \ Date Completed: 2010 \ Cubic Yards Poured: 3,892 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Marriott Courtyard
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 marriott flagg.jpgLocation: Flagstaff, AZ \ G.C.: Wespac Construction \ Date Completed: 2009 \ Cubic Yards Poured: 1,730 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Marriott Courtyard
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 marriott flag.jpgLocation: Flagstaff, AZ \ G.C.: Wespac Construction \ Date Completed: 2009 \ Cubic Yards Poured: 1,730 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Marriott Courtyard
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 marriott flag.jpgLocation: Flagstaff, AZ \ G.C.: Wespac Construction \ Date Completed: 2009 \ Cubic Yards Poured: 1,730 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Marriott Courtyard
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 marriott flag.jpgLocation: Flagstaff, AZ \ G.C.: Wespac Construction \ Date Completed: 2009 \ Cubic Yards Poured: 1,730 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/01 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/02 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/03 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/04 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/05 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/06 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/07 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/08 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/09 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/10 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/11 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/12 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/13 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/14 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/15 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/16 hualapai .jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/17 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/18 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/19 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Hualapai Mountain Medical Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/20 hualapai.jpgLocation: Kingman, AZ \ G.C.: Lott Brothers Construction \ Date Completed: 2010 \ Cubic Yards Poured: 12,695 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Southern Regional Crime Lab
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 srcl.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2010 \ Cubic Yards Poured: 1,463 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Southern Regional Crime Lab
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 srcl.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2010 \ Cubic Yards Poured: 1,463 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Southern Regional Crime Lab
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 srcl.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2010 \ Cubic Yards Poured: 1,463 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Southern Regional Crime Lab
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 srcl.jpgLocation: Tucson, AZ \ G.C.: Summit Builders \ Date Completed: 2010 \ Cubic Yards Poured: 1,463 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Cave Creek Waste Transfer Station
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Cave.jpgLocation: Phoenix, AZ \ General Contractor: Cambridge Builders \ Date Completed: 2007 \ Cubic Yards Poured: 4,453 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Cave Creek Waste Transfer Station
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Cave.jpgLocation: Phoenix, AZ \ General Contractor: Cambridge Builders \ Date Completed: 2007 \ Cubic Yards Poured: 4,453 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Cave Creek Waste Transfer Station
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 Cave.jpgLocation: Phoenix, AZ \ General Contractor: Cambridge Builders \ Date Completed: 2007 \ Cubic Yards Poured: 4,453 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Cave Creek Waste Transfer Station
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 Cave.jpgLocation: Phoenix, AZ \ General Contractor: Cambridge Builders \ Date Completed: 2007 \ Cubic Yards Poured: 4,453 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Williams Field High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/DSC01846.jpgLocation: Gilbert, AZ \ General Contractor: D.L. Withers Cosntruction \ Date Completed: 2007 \ Cubic Yards Poured: 8,970 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Williams Field High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/DSC01847.jpgLocation: Gilbert, AZ \ General Contractor: D.L. Withers Cosntruction \ Date Completed: 2007 \ Cubic Yards Poured: 8,970 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Williams Field High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/DSC01848.jpgLocation: Gilbert, AZ \ General Contractor: D.L. Withers Cosntruction \ Date Completed: 2007 \ Cubic Yards Poured: 8,970 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Williams Field High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/DSC01849.jpgLocation: Gilbert, AZ \ General Contractor: D.L. Withers Cosntruction \ Date Completed: 2007 \ Cubic Yards Poured: 8,970 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Williams Field High School
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/DSC01850.jpgLocation: Gilbert, AZ \ General Contractor: D.L. Withers Cosntruction \ Date Completed: 2007 \ Cubic Yards Poured: 8,970 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Santa Paula Water Recycling Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 sp.jpgLocation: Santa Paula, CA \ General Contractor: Layton Companies \ Date Completed: 2010 \ Cubic Yards Poured: 7,017 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Santa Paula Water Recycling Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 sp.jpgLocation: Santa Paula, CA \ General Contractor: Layton Companies \ Date Completed: 2010 \ Cubic Yards Poured: 7,017 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Santa Paula Water Recycling Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 sp.jpgLocation: Santa Paula, CA \ General Contractor: Layton Companies \ Date Completed: 2010 \ Cubic Yards Poured: 7,017 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Santa Paula Water Recycling Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 sp.jpgLocation: Santa Paula, CA \ General Contractor: Layton Companies \ Date Completed: 2010 \ Cubic Yards Poured: 7,017 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Santa Paula Water Recycling Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 sp.jpgLocation: Santa Paula, CA \ General Contractor: Layton Companies \ Date Completed: 2010 \ Cubic Yards Poured: 7,017 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Santa Paula Water Recycling Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 sp.jpgLocation: Santa Paula, CA \ General Contractor: Layton Companies \ Date Completed: 2010 \ Cubic Yards Poured: 7,017 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Santa Paula Water Recycling Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 sp.jpgLocation: Santa Paula, CA \ General Contractor: Layton Companies \ Date Completed: 2010 \ Cubic Yards Poured: 7,017 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Santa Paula Water Recycling Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 sp.jpgLocation: Santa Paula, CA \ General Contractor: Layton Companies \ Date Completed: 2010 \ Cubic Yards Poured: 7,017 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Santa Paula Water Recycling Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 sp.jpgLocation: Santa Paula, CA \ General Contractor: Layton Companies \ Date Completed: 2010 \ Cubic Yards Poured: 7,017 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Santa Paula Water Recycling Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/9 sp.jpgLocation: Santa Paula, CA \ General Contractor: Layton Companies \ Date Completed: 2010 \ Cubic Yards Poured: 7,017 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Santa Paula Water Recycling Facility
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/10 sp.jpgLocation: Santa Paula, CA \ General Contractor: Layton Companies \ Date Completed: 2010 \ Cubic Yards Poured: 7,017 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Changing Lives Center For Women
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Changing Lives.jpgLocation: Phoenix, AZ \ General Contractor: Redden Construction \ Date Completed: 2011 \ Cubic Yards Poured: 1,607 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Changing Lives Center For Women
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 Changing Lives.jpgLocation: Phoenix, AZ \ General Contractor: Redden Construction \ Date Completed: 2011 \ Cubic Yards Poured: 1,607 \ Services: Footings, Flatwork, Structural, Place & Finish, Sitework
-
Arizona Biltmore Hotel Grill Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 AZ Biltmore Grill .jpgLocation: Phoenix, AZ \ General Contractor: MSR / Tynan Group Inc. \ Date Completed: 2010 \ Cubic Yards Poured: 544 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Arizona Biltmore Hotel Grill Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 AZ Biltmore Grill.jpgLocation: Phoenix, AZ \ General Contractor: MSR / Tynan Group Inc. \ Date Completed: 2010 \ Cubic Yards Poured: 544 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Arizona Biltmore Hotel Grill Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 AZ Biltmore Grill.jpgLocation: Phoenix, AZ \ General Contractor: MSR / Tynan Group Inc. \ Date Completed: 2010 \ Cubic Yards Poured: 544 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Arizona Biltmore Hotel Grill Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 AZ Biltmore Grill.jpgLocation: Phoenix, AZ \ General Contractor: MSR / Tynan Group Inc. \ Date Completed: 2010 \ Cubic Yards Poured: 544 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Arizona Biltmore Hotel Grill Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 AZ Biltmore Grill.jpgLocation: Phoenix, AZ \ General Contractor: MSR / Tynan Group Inc. \ Date Completed: 2010 \ Cubic Yards Poured: 544 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Arizona Biltmore Hotel Grill Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 AZ Biltmore Grill.jpgLocation: Phoenix, AZ \ General Contractor: MSR / Tynan Group Inc. \ Date Completed: 2010 \ Cubic Yards Poured: 544 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
New Headquarters For San Carlos Irrigation Project
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 San Carlos.jpgLocation: Coolidge, AZ \ General Contractor: Alutiq \ Date Completed: 2011 \ Cubic Yards Poured: 3,122 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
New Headquarters For San Carlos Irrigation Project
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 San Carlos.jpgLocation: Coolidge, AZ \ General Contractor: Alutiq \ Date Completed: 2011 \ Cubic Yards Poured: 3,122 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Arizona Biltmore Hotel Grill Expansion
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 AZ Biltmore Grill.jpgLocation: Phoenix, AZ \ General Contractor: MSR / Tynan Group Inc. \ Date Completed: 2010 \ Cubic Yards Poured: 544 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
New Headquarters For San Carlos Irrigation Project
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 San Carlos.jpgLocation: Coolidge, AZ \ General Contractor: Alutiq \ Date Completed: 2011 \ Cubic Yards Poured: 3,122 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
New Headquarters For San Carlos Irrigation Project
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 San Carlos.jpgLocation: Coolidge, AZ \ General Contractor: Alutiq \ Date Completed: 2011 \ Cubic Yards Poured: 3,122 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
New Headquarters For San Carlos Irrigation Project
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 San Carlos.jpgLocation: Coolidge, AZ \ General Contractor: Alutiq \ Date Completed: 2011 \ Cubic Yards Poured: 3,122 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
New Headquarters For San Carlos Irrigation Project
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 San Carlos.jpgLocation: Coolidge, AZ \ General Contractor: Alutiq \ Date Completed: 2011 \ Cubic Yards Poured: 3,122 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
New Headquarters For San Carlos Irrigation Project
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6A San Carlos.jpgLocation: Coolidge, AZ \ General Contractor: Alutiq \ Date Completed: 2011 \ Cubic Yards Poured: 3,122 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
New Headquarters For San Carlos Irrigation Project
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/7 San Carlos.jpgLocation: Coolidge, AZ \ General Contractor: Alutiq \ Date Completed: 2011 \ Cubic Yards Poured: 3,122 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
New Headquarters For San Carlos Irrigation Project
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/8 San Carlos.jpgLocation: Coolidge, AZ \ General Contractor: Alutiq \ Date Completed: 2011 \ Cubic Yards Poured: 3,122 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
New Headquarters For San Carlos Irrigation Project
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/9 San Carlos.jpgLocation: Coolidge, AZ \ General Contractor: Alutiq \ Date Completed: 2011 \ Cubic Yards Poured: 3,122 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
IOCC - Intelligence Operations Control Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 iocc.jpgLocation: Tucson, AZ \ General Contractor: Suulataaq, Inc. \ Date Completed: 2010 \ Cubic Yards Poured: 1,558 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
IOCC - Intelligence Operations Control Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 iocc.jpgLocation: Tucson, AZ \ General Contractor: Suulataaq, Inc. \ Date Completed: 2010 \ Cubic Yards Poured: 1,558 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
IOCC - Intelligence Operations Control Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 iocc.jpgLocation: Tucson, AZ \ General Contractor: Suulataaq, Inc. \ Date Completed: 2010 \ Cubic Yards Poured: 1,558 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
IOCC - Intelligence Operations Control Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 iocc.jpgLocation: Tucson, AZ \ General Contractor: Suulataaq, Inc. \ Date Completed: 2010 \ Cubic Yards Poured: 1,558 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
IOCC - Intelligence Operations Control Center
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/6 iocc.jpgLocation: Tucson, AZ \ General Contractor: Suulataaq, Inc. \ Date Completed: 2010 \ Cubic Yards Poured: 1,558 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Taco Bell
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 Taco Bell.jpgLocation: Tucson, AZ \ General Contractor: Haworth Corporation \ Date Completed: 2010 \ Cubic Yards Poured: 400 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
White Sands Missle Range
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 white sands.jpgLocation: White Sands, NM \ General Contractor: Alliance Riggers / MA Mortenson \ Date Completed: 2010 \ Cubic Yards Poured: 3,032 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish
-
White Sands Missle Range
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 white sands.jpgLocation: White Sands, NM \ General Contractor: Alliance Riggers / MA Mortenson \ Date Completed: 2010 \ Cubic Yards Poured: 3,032 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish
-
White Sands Missle Range
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 white sands.jpgLocation: White Sands, NM \ General Contractor: Alliance Riggers / MA Mortenson \ Date Completed: 2010 \ Cubic Yards Poured: 3,032 \ Services: Footings, Flatwork, Structural, Tilt-Up, Place & Finish
-
Taco Bell - Speedway
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/1 taco bell sw.jpgLocation: Tucson, AZ \ General Contractor: Haworth Corporation \ Date Completed: 2010 \ Cubic Yards Poured: 291 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Taco Bell - Speedway
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/2 taco bell sw.jpgLocation: Tucson, AZ \ General Contractor: Haworth Corporation \ Date Completed: 2010 \ Cubic Yards Poured: 291 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Taco Bell - Speedway
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/3 taco bell sw.jpgLocation: Tucson, AZ \ General Contractor: Haworth Corporation \ Date Completed: 2010 \ Cubic Yards Poured: 291 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Taco Bell - Speedway
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/4 taco bell sw.jpgLocation: Tucson, AZ \ General Contractor: Haworth Corporation \ Date Completed: 2010 \ Cubic Yards Poured: 291 \ Services: Footings, Flatwork, Place & Finish, Sitework
-
Taco Bell - Speedway
http://www.hrconcrete.com/wp-content/uploads/slideshow-gallery/5 taco bell sw.jpgLocation: Tucson, AZ \ General Contractor: Haworth Corporation \ Date Completed: 2010 \ Cubic Yards Poured: 291 \ Services: Footings, Flatwork, Place & Finish, Sitework
